- Asked by: Patrick Harvie, MSP for Glasgow, Scottish Green Party
-
Date lodged: Tuesday, 08 March 2011
-
Current Status:
Answered by Jim Mather on 14 March 2011
To ask the Scottish Executive for what reason an invalid email address was given on the Energy Consents Unit website for objections to be made to Forth Energy鈥檚 proposals for a biomass power station at Dundee and what steps it took to rectify this problem.
Answer
Press notices were placed in the Scotsman on 17 August 2010 and in the Dundee Courier and Edinburgh Gazette on 17 August 2010 and 24 August 2010 advising members of the public of the submission of the application. These notices advised members of the public to submit representations to
[email protected], which is the enquiries email address for the Energy Consents and Deployment Unit (ECDU). The second press notices for this development were placed in
The Scotsman on 9 November 2010 and in
The Courier and
Edinburgh Gazette on 9 November 2010 and 16 November 2010. These notices advised members of the public to submit representations to the dedicated Dundee Biomass email address
[email protected], which had been implemented to deal with the level of representations being received. The biomass section of the ECDU website quoted the dedicated email address as the point of contact during the consultation. The ECDU enquiries email address is quoted elsewhere on the website as general point of contact, hence no amendment or correction was required.
All representations received to either email addresses have been collated and logged.
- Asked by: Patrick Harvie, MSP for Glasgow, Scottish Green Party
-
Date lodged: Tuesday, 08 March 2011
-
Current Status:
Answered by Jim Mather on 14 March 2011
To ask the Scottish Executive whether it has acknowledged receipt of every objection letter that its Energy Consents Unit has received in relation to Forth Energy鈥檚 proposals for a biomass power station at Dundee.
Answer
There is no requirement under legislation to acknowledge, either in writing or electronically, representations received.
Due to the excessive cost, both in postage and in staff time, it is no longer the policy of the Energy Consents and Deployment Unit (ECDU) to respond in writing to representations received. Should the representation have been submitted by email, to the email address stated in the press notices, [email protected], the author will receive an automatic acknowledgement. All representations received are collated and logged and form part of the final determination process for the application.
- Asked by: Patrick Harvie, MSP for Glasgow, Scottish Green Party
-
Date lodged: Thursday, 03 March 2011
-
Current Status:
Answered by Keith Brown on 14 March 2011
To ask the Scottish Executive what the actual cost to BP will be if the Forties pipeline system is damaged during construction of the Forth Replacement Crossing.
Answer
Financial information relating to those costs is commercially confidential and cannot be released. In any event, the actual costs cannot be determined in the abstract and will depend on the particular facts and circumstances.
- Asked by: Patrick Harvie, MSP for Glasgow, Scottish Green Party
-
Date lodged: Thursday, 03 March 2011
-
Current Status:
Answered by Keith Brown on 14 March 2011
To ask the Scottish Executive whether, in relation to the BP Forties pipeline system, Transport Scotland investigated whether it would be safer to move the Southern Approach Road to link directly from the new Forth Bridge on the west side of Dundas Castle to the M9 at Winchburgh and, if so, for what reason the report of that investigation was not made available as part of the environmental statement for the Forth Crossing Act 2011.
Answer
During 2008, Transport Scotland considered a number of alternative options for the southern connecting roads. An assessment of the options and the reasoning for their rejection is provided in the DMRB Stage 2 Corridor Report. The location of the BP pipeline was considered in this assessment. This is outwith the remit of the Environmental Statement.
- Asked by: Patrick Harvie, MSP for Glasgow, Scottish Green Party
-
Date lodged: Thursday, 03 March 2011
-
Current Status:
Answered by Keith Brown on 14 March 2011
To ask the Scottish Executive for what reason the contingency liability for BP has been capped at 拢100 million if the Forties pipeline system is damaged during the construction of the Forth Replacement Crossing.
Answer
The sum is typical of these types of arrangements in the Oil and Gas industry and was arrived at following negotiation with BP. The number represents the maximum potential liability under the Agreement and BP will bear any losses which exceed that amount.
- Asked by: Patrick Harvie, MSP for Glasgow, Scottish Green Party
-
Date lodged: Thursday, 03 March 2011
-
Current Status:
Answered by Keith Brown on 14 March 2011
To ask the Scottish Executive whether Transport Scotland has a business continuity programme in place to manage the risks in the event of the BP Forties pipeline system being damaged during construction of the Forth Replacement Crossing.
Answer
Transport Scotland will continue to operate in the event of any damage to the pipeline.
- Asked by: Patrick Harvie, MSP for Glasgow, Scottish Green Party
-
Date lodged: Thursday, 03 March 2011
-
Current Status:
Answered by Keith Brown on 14 March 2011
To ask the Scottish Executive what plans have been put in place to carry out routine or other maintenance to the BP Forties pipeline system where the Southern Approach Road crosses it; who will bear the cost, and whether a risk assessment has been carried out.
Answer
The works undertaken during the Forth Replacement Crossing works will ensure further routine and other maintenance on the pipeline does not disrupt the Southern Approach Roads. Any future work on the pipeline after completion of the road will be carried out within BP''s risk assessments and at BP''s cost.
- Asked by: Patrick Harvie, MSP for Glasgow, Scottish Green Party
-
Date lodged: Thursday, 03 March 2011
-
Current Status:
Answered by Keith Brown on 14 March 2011
To ask the Scottish Executive what BP鈥檚 estimate is of lost revenue in the event of damage to the BP Forties pipeline system during construction of the Forth Replacement Crossing.
Answer
Financial information relating to those costs is commercially confidential and cannot be released.
- Asked by: Patrick Harvie, MSP for Glasgow, Scottish Green Party
-
Date lodged: Thursday, 03 March 2011
-
Current Status:
Answered by Keith Brown on 14 March 2011
To ask the Scottish Executive what volume of oil would be spilt if the BP Forties pipeline system were ruptured during construction of the Forth Replacement Crossing.
Answer
While the volume has been calculated for designing suitable mitigation measures it would be inappropriate to release this information.
- Asked by: Patrick Harvie, MSP for Glasgow, Scottish Green Party
-
Date lodged: Thursday, 03 March 2011
-
Current Status:
Answered by Keith Brown on 14 March 2011
To ask the Scottish Executive whether there are insurance policies or contingency liabilities in place for local residents and businesses for any damage incurred to them in the event of the BP Forties pipeline system being damaged during construction of the Forth Replacement Crossing.
Answer
The Project Insurance Programme includes provision for third party damage. There are no Third Party Contingent Liabilities.