- Asked by: Douglas Lumsden, MSP for North East Scotland, Scottish Conservative and Unionist Party
-
Date lodged: Monday, 05 February 2024
-
Current Status:
Answered by Fiona Hyslop on 19 February 2024
To ask the Scottish Government whether it will provide an update on its plans to decarbonise the rail network between Aberdeen and the Central Belt.
Answer
No date has been set for the decarbonisation of the lines between Aberdeen and Edinburgh, and Aberdeen and the electrified network at Dunblane. However, in line with the Rail Decarbonisation Action Plan, these routes are under consideration for future decarbonisation through electrification by Transport Scotland, with plans at an early stage of development.
As set out in the Decarbonisation Action Plan, the order and pace in which decarbonisation is undertaken has always, and continues to, depend on business cases and available budgets.
- Asked by: Douglas Lumsden, MSP for North East Scotland, Scottish Conservative and Unionist Party
-
Date lodged: Tuesday, 06 February 2024
-
Current Status:
Answered by Mairi McAllan on 19 February 2024
To ask the Scottish Government what the value of oil and gas exports, as a percentage of Scotland’s total exports, has been in each financial year from 2014-15 to date.
Answer
There are no statistics available on Scotland’s total exports including oil and gas on a quarterly or a financial year basis. On a calendar year basis, the latest available official statistics in development (previously known as experimental statistics) include estimates up to 2021.
| Exports of oil and gas as a percentage of total exports |
2014 | 21.5% |
2015 | 16.7% |
2016 | 15.1% |
2017 | 17.5% |
2018 | 22.2% |
2019 | 20.1% |
2020(provisional) | 15.1% |
2021(provisional) | 22.0% |
Source: (28 June 2023), calculations based on data from Table 1
- Asked by: Douglas Lumsden, MSP for North East Scotland, Scottish Conservative and Unionist Party
-
Date lodged: Tuesday, 06 February 2024
-
Current Status:
Answered by Fiona Hyslop on 19 February 2024
To ask the Scottish Government how much has been spent on improving drainage on the A90 from Dundee to Aberdeen in each financial year from 2019-20 to date.
Answer
As trunk road maintenance costs are held on a whole route basis we are unable to provide figures for the section of the A90 trunk road from Dundee to Aberdeen.
However, please see the following table for details of how much was spent on improving drainage on the whole of the A90 trunk road for the financial years 2019-20 onwards. These works are in addition to regular asset inspections undertaken through the maintenance contracts, which then develop and prioritises programmes of works.
| 2019-20 | 2020-21 | 2021-22 | 2022-23 | 2023-24 | Total spend |
Total | £612,625 | £92,056 | £564,815 | £122,464 | £1,035 | £1,392,995 |
Please note that these figures relate to drainage-specific works. On occasions where drainage elements were included in larger schemes (e.g. major resurfacing works), we are unable to disaggregate drainage costs in those situations and as such, those figures will not appear in the table above.
Due to the condition of the drainage assets on the Aberdeen Western Peripheral Route (AWPR) section of the A90 trunk road, there have been no drainage-specific improvement schemes undertaken in this period.
- Asked by: Douglas Lumsden, MSP for North East Scotland, Scottish Conservative and Unionist Party
-
Date lodged: Tuesday, 06 February 2024
-
Current Status:
Answered by Fiona Hyslop on 19 February 2024
To ask the Scottish Government how many times the A90 from Dundee to Aberdeen has been closed due to a lack of adequate drainage in each financial year from 2019-20 to date.
Answer
Records show there has been no instances of road closures due to lack of adequate drainage on the A90 trunk road from Dundee to Aberdeen from 2019-20 to date.
- Asked by: Douglas Lumsden, MSP for North East Scotland, Scottish Conservative and Unionist Party
-
Date lodged: Thursday, 01 February 2024
-
Current Status:
Answered by Patrick Harvie on 19 February 2024
To ask the Scottish Government whether it has undertaken an analysis of the total (scope 1, 2 and 3) carbon cost of replacing fossil fuel boilers in Scotland with air source heat pumps and heat networks.
Answer
We monitor the operational carbon caused both directly and indirectly by the polluting heating systems used in the majority of Scotland’s buildings via the Scottish Greenhouse Gas Statistics ( , which provides statistics on the level of emissions by source. Estimates of Scotland’s consumption emissions (broadly analogous to upstream scope 3 emissions) are published in Scotland’s Carbon Footprint ( . However, it is not possible to isolate heating systems from other similar products using this dataset.
We are continuing to investigate how we can improve whole life emissions reporting in Scotland’s buildings.
- Asked by: Douglas Lumsden, MSP for North East Scotland, Scottish Conservative and Unionist Party
-
Date lodged: Tuesday, 06 February 2024
-
Current Status:
Answered by Fiona Hyslop on 19 February 2024
To ask the Scottish Government how much has been spent on safety improvements on the A96 between Inverness and Aberdeen in each of the last three financial years.
Answer
The following amounts have been spent on safety improvements on the A96 between Inverness and Aberdeen in each of the last full three financial years:
Year | Spent |
2020-21 | £102,076.99 |
2021-22 | £102,018.66 |
2022-23 | £610,017.72 |
This spend is delivered through Transport Scotland’s Trunk Road Casualty Reduction programme of works. These figures include costs for investigation and design.
These amounts do not include some elements of wider spend across the North East Operating Company Unit as it is not possible identify those that relate specifically to the A96.
- Asked by: Douglas Lumsden, MSP for North East Scotland, Scottish Conservative and Unionist Party
-
Date lodged: Monday, 05 February 2024
-
Current Status:
Answered by Tom Arthur on 16 February 2024
To ask the Scottish Government what analysis it has undertaken of any impact of local authorities decreasing relief on non-domestic rates for empty, listed properties.
Answer
Empty Property Relief was devolved to local authorities on 1 April 2023, and it is for individual local authorities to decide how they will tailor any support for unoccupied property, including listed buildings, to best support their local needs.
As indicated in the recommendations of the New Deal for Business Non-Domestic Rates sub-group, the Scottish Government will undertake an initial review of the devolution of Empty Property Relief before the next revaluation in 2026.
- Asked by: Douglas Lumsden, MSP for North East Scotland, Scottish Conservative and Unionist Party
-
Date lodged: Tuesday, 06 February 2024
-
Current Status:
Answered by Fiona Hyslop on 15 February 2024
To ask the Scottish Government how much has been spent on improvements on the A96 between Aberdeen and Nairn in the last 12 months.
Answer
The Scottish Government has spent £6.2m on structural maintenance, strategic road safety and climate change adaption improvements on the A96 between Aberdeen and Nairn in the last 12 months. These costs comprise of construction costs only and do not include design, investigation, or environmental costs of these schemes.
- Asked by: Douglas Lumsden, MSP for North East Scotland, Scottish Conservative and Unionist Party
-
Date lodged: Friday, 26 January 2024
-
Current Status:
Answered by Richard Lochhead on 7 February 2024
To ask the Scottish Government, of the 36,100 premises that have been connected under the R100 scheme to date, how many are gigabit-capable.
Answer
Of the 36,100 premises connected so far through the R100 contracts, 1,600 have been connected through Fibre To The Cabinet broadband which can provide a minimum of a superfast service. The remaining 34,500 connections have been delivered utilising Fibre To The Premises which is capable of delivering a gigabit broadband service.
- Asked by: Douglas Lumsden, MSP for North East Scotland, Scottish Conservative and Unionist Party
-
Date lodged: Friday, 26 January 2024
-
Current Status:
Answered by Richard Lochhead on 7 February 2024
To ask the Scottish Government, of the 114,869 premises to be connected under the R100 scheme, how many will be connected with gigabit-capable broadband.
Answer
Of the 114,869 premises currently expected to be connected through the R100 contracts, only 1,600 will be connected through Fibre To The Cabinet broadband. The remaining 113,269 will be connected with Fibre To The Premises which is a gigabit-capable technology.